
Project overview
Large warehouse floor refurbishment following fire damage. Works included mechanical preparation and industrial floor coating installation. A dilapidation project involving diamond grinding and localised floor repairs before final refurbishment.
A single Gloucester refurbishment project
Woodrow Way and Gloucester Dilapidation refer to the same 4,300 m² warehouse project. The work followed fire damage and combined mechanical floor preparation, diamond grinding, localised repairs and industrial floor coating installation.
Keeping the repair and coating scope together matters when an existing warehouse floor needs refurbishment: the coating finish relies on the substrate beneath it, so repairs and preparation form part of the overall specification.
Preparation before the finish
This project illustrates a refurbishment approach that addresses the existing floor before applying the final coating. For a comparable dilapidation project, we would discuss the concrete condition, areas requiring repairs, intended use and access arrangements before proposing a floor refurbishment scope.
Planning a similar project?
Send us your floor area, location, existing floor condition and project dates. We can discuss the preparation and coating approach for your facility.
Request a Quotation