Typical Defects
- cracks
- potholes
- spalling
- damaged edges
- worn joints
- impact damage
- failed patch repairs
Repairs Before Floor Painting
A new coating will not hide structural or physical defects.
Repairs may therefore be completed before final surface preparation and coating.
Crack Repairs
Cracks can be repaired using suitable materials depending on their nature and movement.
Pothole Repairs
Localised potholes can be cut back and reinstated before coating.
Damaged Joints
Worn or damaged joints may require repair before floor finishing.
Failed Previous Repairs
Older patch repairs that have debonded may need to be removed and replaced.
Request a Concrete Floor Repair Assessment