What Determines Floor Painting Cost?
Main cost factors include:
- total area
- substrate condition
- existing coatings
- coating removal
- concrete repairs
- grinding
- coating type
- number of coats
- anti-slip aggregate
- line marking
- access
- working hours
- programme
Floor Preparation Cost
Preparation is often a substantial part of the project cost.
Where a slab requires extensive grinding or coating removal, labour and equipment requirements increase.
Existing Coating Removal
A poorly bonded coating may need complete removal before a new system can be installed.
This will normally cost more than lightly preparing a well-adhered existing coating.
Concrete Repairs
Repairs may be needed for:
- cracks
- potholes
- damaged joints
- impact damage
- failed previous repairs
Number of Coats
A simple coating system and a heavy-duty multi-coat system have different material and labour requirements.
Anti-Slip Finishes
Broadcast aggregate and additional coats can add cost compared with a simple smooth finish.
Line Marking
Walkways, bays and safety marking should be priced separately where they form a significant part of the works.
Night and Weekend Working
Restricted working hours can affect cost due to:
- labour premiums
- reduced productivity
- complex phasing
Getting an Accurate Quotation
The most useful information to provide is:
- floor area
- site postcode
- photographs
- existing floor type
- existing coating
- damage
- operational requirements
- project dates
Drawings are also helpful on larger projects.
Practical answers
Frequently Asked Questions
Can you give a price per square metre?
Indicative pricing may be possible once the floor condition and specification are understood.
Is grinding included?
That depends on the quotation and required preparation.
Are repairs included?
Repairs should be clearly identified and priced within the scope.